
Hanoi prioritizes the construction of river tunnels that include railway lines.
Hanoi prioritizes multi-level river tunnel solutions, combining road and rail transport, to save land for site clearance and protect the landscape.

Hanoi prioritizes multi-level river tunnel solutions, combining road and rail transport, to save land for site clearance and protect the landscape.

The planned two-tiered road tunnel across the Red River in the northern area is expected to be 5,6 km long, consisting of two tunnel tubes with a diameter of 15,2 m, connecting Phu Thuong ward to Vinh Thanh commune (Hanoi).

(VTC News) - On August 24, the BBC reported that a plane carrying a British nurse working in West Africa who was infected with the Ebola virus had landed in London.